Just got in from "up north" at my property. Things are coming along with the house.
The plumbing (drains and sewer lines) was done last week along with the piping of gas lines to the furnace and stove.
The pump was turned on and we now have running water, both hot and cold.
We got water!!! This is in the utility/laundry room sink
The propane tank line was connected to the house. Propane delivery is tomorrow so we should have the furnace up and running by Wednesday, not that it was needed. It was 75 degrees today.
Gas regulator and dryer vent
They were missing an outside carriage light on the garage so that was installed as well as fixing some outside trim.
Before....Where's the light???
The fixit guy also put a retaining wall thingy around the crawl space hatch.
Before...while running the underground electrical cable

After...I was wondering what they were going to do with that. Kind of wish now I had done a basement. Now I have to build a cover over it to keep it from filling up with snow.
List of stuff to finish...
-some dry wall and painting-next week
-steps from the garage to the house-sometime this week
-Installation of bedroom doors/frames-next week
-Finish tying the carpet halves together-week after next
-deep cleaning and inspection, week after next
-Occupancy?
Why it takes 3 weeks to do a week's worth of stuff I'll never know.